As we started the project, our aim was to simplify and enhance the production process of a product that required a lot of work and various steps to complete. The demanding floor construction that the customer presented to us had 19 different parts. By using simulations, we managed to find the right method that ensured that the construction could be done in two parts using the deep drawing method. Efficient simulation and close co-operation shortened the total completion time of the project and lowered its costs. “Actually, simulation is one of the best services that Meconet has to offer”, says CEO Timo Lehtioja from MSK Group.